![Lynmall-Brickworks-entry-2 Lynmall-Brickworks-entry-2](https://www.nzstrong.co.nz/wp-content/uploads/Lynmall-Brickworks-entry-2-1600x600.jpg)
![Lynmall-Brickworks-entry Lynmall-Brickworks-entry](https://www.nzstrong.co.nz/wp-content/uploads/Lynmall-Brickworks-entry-1600x600.jpg)
![LynnMall-Food-Lane LynnMall-Food-Lane](https://www.nzstrong.co.nz/wp-content/uploads/LynnMall-Food-Lane-1600x600.jpg)
![LynnMall-Food-Lane-2 LynnMall-Food-Lane-2](https://www.nzstrong.co.nz/wp-content/uploads/LynnMall-Food-Lane-2-1600x600.jpg)
![LynnMall-Cinema LynnMall-Cinema](https://www.nzstrong.co.nz/wp-content/uploads/LynnMall-Cinema-1600x600.jpg)
Construction of an eight theatre cinema, dining lane and reconfiguration of existing specialty retail tenancies.
This was a challenging project with a short construction programme and required a very efficient start. As part of the structural design “creep” a major re-vamp of the construction programme was required. The site management team utilised connections/relationships with subcontractors to create and agree an accelerated programme whilst ensuring no costs were incurred as a result.
All of the client’s operational requirements were met with CCC achieved prior to practical completion. Construction was coordinated in, over, and around a live, existing shopping mall. Regular, clear communication and planning ensured there were no disruptions to mall operations.