We’re not aiming to be the biggest; our goal is to be the smartest.

We pride ourselves on our ability to find innovative yet practical solutions for tricky problems.

NORTHERN BUSWAYS

Problem - How to build a pedestrian bridge over a fully operational 6 lane motorway?

Solution - Design a moving trolley system that enables safe construction anytime. Concrete pours, welding and glassfitting were all done over a live motorway.

MOTAT

Problem - How to rotate and shift an existing historic blister hangar 100m across site?  Dismantling and relocating the building would have caused serious damage.

Solution - Design and build two 30m long steel 'ski's and gently drag and slide the building into position without incident.